Franjo Novosel, M.Sc. in Mechanical Engineering

The paper presents the project of reconstruction and energy renovation of the thermal energy system of the Special Hospital for Medical Rehabilitation Krapinske Toplice by introducing a system of geothermal heat pumps as the primary sources for heating, domestic hot water preparation and cooling. The basic concept of the system, the use of thermal water from the Pučka kupelj spring, and the hydraulic connection of heat pumps to the existing gas system are presented. Particular emphasis was placed on the behaviour of the geothermal source under the actual load of the system, as measurements taken during the commissioning of the system showed a deviation of the dynamic water level from the values expected based on previous hydrogeological analyses. In the following section, the paper presents the experiences and challenges from the implementation, operation and maintenance phases from the perspective of the contractor and the company involved in the regular maintenance and monitoring of the system's operation.

Hospital complex of the Special hospital Krapinske Toplice (SBKT)

The Special Hospital for Medical Rehabilitation Krapinske Toplice is, by its purpose, a hospital for medical rehabilitation and for integrated specialist and consultative healthcare. The buildings within the complex are of different ages and characteristics, built in the period from the establishment of the spa in 1860 until the last upgrade in 2008. The energy renovation and earthquake damage repair projects at the Special Hospital for Medical Rehabilitation Krapinske Toplice (SBKT) took place in several phases, starting in 2020, when emergency measures were implemented to repair structural and internal damage. Additional interventions included the installation of a PV power plant and the energy renovation of the NBO building, the reconstruction of the boiler room, heat substations and ventilation and mechanical rooms, the complete and structural renovation of the old hospital building, and in 2027, the reconstruction of dilapidated pumps, pumping stations and pipelines within the catchment area will be completed.

Geothermal potential at the site

The geothermal potential of the Krapinske Toplice system has been used for balneological purposes for several centuries at several locations, such as Gospodska, Jakobova, Marijina and Pučka kupelj (Baths), but the intensive balneological and energy utilisation of the spring has been carried out for the last fifty years. The new thermal energy system encompassed the reconstruction of Pučka kupelj, as the most abundant source with a constant year-round thermal water temperature of roughly 41 °C, and connected it to the heat pump system to maximize the energy potential.

In the current state, the thermal water from the Catchment is discharged into the Topličina stream via overflow, and a significant portion of the energy that can be efficiently used by heat pumps in a wider area is lost, which would enable significant savings in energy costs. The Jakobova kupelj spring is located at the bottom of the pool of the same name within the hospital facilities, also with a constant overflow into the Topličina stream. Since this is an aquifer with rainwater recharge and circulation, the renewability of the geothermal source is unquestionable, but increased pumping of the geothermal source in question leads to a lowering of the groundwater level in other baths and other sources at the site, i.e., it has a negative impact on the sustainability of the utilisation of the geothermal source. Based on all the historically available documentation, the total permissible pumping capacity for the new condition after the reconstruction of the Catchment was determined, which plans the retention of the existing consumers (total capacity of 36 L/s) and the addition of a new consumer (a boiler room with heat pumps with a peak intake of 30 L/s). The AQUA VIVAE water park is supplied with water from the Catchment via a self-overflow through a suction strainer, which must always be submerged in order to ensure water distribution by gravity. Other consumers meet their supply needs through submersible or suction pumps.

By taking into account the pumping volumes of all the consumers in the new design, the simultaneity factor of consumption, the management method, and historical water level measurements, the analysis concluded that the peak load of 42 L/s from the source will meet the needs of all consumers.  

Reconstruction of the boiler room, main heating station, thermal substations, and mechanical rooms, and the construction of a new substation

The existing infrastructure includes the thermal energy system of the hospital complex with 4 gas hot water boilers with a total rated output of 5,900 kW (space heating, DHW, air conditioning) and 2 gas steam boilers  with a total rated output of 2,500 kW (DHW, laundry) of an older generation. Also, 2 older-generation water-to-water heat pumps (1991) were installed in the boiler room, which were intended for heating the complex in night mode and used R22 as the working fluid. Radiators were used as heating elements. In some buildings of the complex, air handling units with associated ductwork were installed for air conditioning purposes. The existing thermal energy systems were energy-inefficient and outdated, and part of the infrastructure was damaged in the earthquake, which required additional reconstruction and modernization of the energy systems. The geothermal potential of the site was not fully exploited. The energy plant management system was not integrated into a single monitoring system.

The reconstruction project of the boiler room and the main heating station involved the installation of two new condensing gas boilers (2 × 1,550 kW = 3,100 kW), which replaced the existing hot water and steam boilers.

Six new water-to-water geothermal heat pumps were installed (2 x 1,028 kW: DT1, DT2, 4 x 524 kW: DT3, DT4, DT5, DT6), with a total rated heating capacity of 4,152 kW, which are used for heating and cooling rooms, air conditioning and domestic hot water preparation. The units are adapted for high-temperature operation, as they are connected to the existing radiator system, have electronic expansion valves and a wide range of modulation, and use R134a as the refrigerant. The 1,028 kW units use semi-hermetic screw compressors (each unit has 2 refrigerant circuits, each circuit has 1 compressor), shell & tube heat exchangers, and the maximum temperature of the supply line is 63 °C. The 524 kW units have hermetic scroll compressors (each unit has 2 refrigerant circuits, each circuit has 2 compressors), plate heat exchangers, and the maximum flow line temperature is 80 °C.   

To ensure the minimum required installation volume and reduce the number of compressor starts and stops, an accumulation buffer tank (V = 3,000 l) was installed. The quality of the heating water is ensured by a demineralization device and a degassing device. On the condenser water side, the heat pumps are separated from the existing installation by plate heat exchangers. This protects the condenser from clogging, impurity deposition, and reduced heat transfer. A similar situation exists on the evaporator water side, where the evaporator is protected from impurities and chemically aggressive untreated thermal water from the source via a plate heat exchanger (evaporator intermediate circuit). As part of the project for the complete and structural renovation of the Old Building, the DT1 heat pump (1x 1,028 kW) was subsequently connected to the new cooling installation of the Old Building (approx. 250 kW). Since these are devices without a changeover valve on the refrigerant side, the changeover of the operating mode is solved by control valves on the water side. It is planned to connect the same heat pump to the future cooling system of the NBO building (New Hospital Block), given the excess available cooling capacity. In order to meet the acoustic requirements, i.e., to ensure adequate protection against noise generated by the operation of the boiler room and spreading into the environment, it was necessary to soundproof the external walls, windows, doors and ceilings of the boiler room with sound absorbers. Sound-insulated panel cabins have also been constructed around the heat pumps.

The entire geothermal pre-insulated underground hot water pipeline was reconstructed, new submersible pumps with variable speed were installed in the catchment, and all equipment in the pumping station was replaced. In all heat substations and ventilation and mechanical rooms, all tanks, pumps, control valves, manifolds, pipelines and other equipment were replaced. Eight air handling units and the associated ductwork within the ventilation/mechanical rooms in the air conditioning systems were replaced, as were all existing radiator valves with new pressure-independent control valves with thermostatic heads that enable better hydraulic balancing of the system and precise temperature control in each room. A central monitoring and control system (CMCS) has been implemented, which enables real-time monitoring and control of all parts of the complex thermal energy system and full automation of the plant. Due to the quality and security of electricity supply, a new substation with 2 transformers (630 kVA + 1000 kVA) and associated electrical equipment was built, as well as a new communication network between the buildings, in order to connect all stations into a single heating and ventilation system. A 40 kWp photovoltaic power plant was also installed on the roof of the building.

System operation

The heating system is hydraulically designed to allow 3 operating modes: independent operation of heat pumps, parallel operation of heat pumps and gas boilers (at peak loads), and independent operation of boilers (as a backup). When preparing DHW, gas boilers are used for thermal disinfection, and heat pumps have priority in preparing hot water.

The system is designed to use geothermal water-to-water heat pumps as the primary energy source for heating, DHW preparation, and air conditioning. Most of the buildings in the hospital complex (NBO, NNBO, Old Building (Stara zgrada) have undergone energy renovation, i.e., under design conditions, they have a heating water temperature regime of 60/40 °C. Other buildings in the complex, under design conditions, have a heating water temperature regime of 80/60 °C. Geothermal heat pumps have sufficient heating capacity to cover the entire design heat loss of the hospital complex, but the units cannot provide a flow water temperature of 80 °C (due to the design of the hydraulic connection, which is constrained by the available space within the boiler room). For a smaller part of the buildings in the hospital complex, the temperature is maintained through the parallel operation of the heat pumps and gas boilers. For heating purposes, the heat pumps operate with a temperature regime of 63/53 °C in the condenser intermediate circuit.

Given the limited available pumping capacity of thermal water from the catchment and the lack of space in the boiler room, the evaporative intermediate circuit heat exchangers are hydraulically connected in series. A total of 4 heat exchangers were installed: one common heat exchanger for DT3 and DT4, a common heat exchanger for DT5 and DT6, and one heat exchanger each for DT1 and DT2. The design flow rate of thermal water is 30 L/s.  The first heat exchanger in the series is the DT5-DT6 heat exchanger (primary: 41/36 °C; secondary: 39/34 °C), followed by the DT3-DT4 heat exchanger (primary: 36/31 °C; secondary: 34/29 °C),  followed by the DT2 heat exchanger (primary: 31/26 °C; secondary: 32/24 °C), and the last heat exchanger in the series is DT1 (primary: 26/21 °C; secondary: 24/19 °C).

After passing through all 4 heat exchangers under design conditions, the thermal water is cooled to a relatively high temperature of 21 °C. For this reason, additional utilization of return thermal water from the boiler room for the thermal energy system of the future expansion of the hospital complex is planned. Due to the type of compressors (screw) in the evaporator intermediate circuit of heat pumps DT1 and DT2, it is necessary to install a 3-way control valve and a bypass (double mixing circuit), which ensure that the temperature of the outlet water from the evaporator does not exceed 15 °C.  Given the absence of more recent measurements of catchment yield, the design intentionally oversized the evaporative intermediate circuit heat exchangers so that the required capacity could be exchanged even in the event of a lower thermal water flow. Such a decision proved to be correct and necessary during the system's operation phase.

The new design provides DHW heating through storage tanks equipped with external plate heat exchangers, in which the heating water (78/68 °C) is used to raise the domestic thermal water temperature from 40 °C to the design temperature of 60 °C. DHW is prepared in 2 separate substations. Domestic hot water for the entire hospital complex is also provided throughout the year by heat pumps (78/68 °C). The DT6 unit is primarily used for heating DHW, while the DT5 unit is hydraulically connected as a backup in case of DT6 failure or maintenance. Heat pumps operate based on a cascade algorithm, and the temperature of the supply line is controlled according to the outside temperature. Gas condensing boilers are used during peak loads for heating only parts of the buildings in the hospital complex with a design temperature regime of heating water of 80/60°C and for periodic thermal disinfection of DHW installations. Boilers are also used as a backup system for heating and DHW preparation when heat pumps are out of service (malfunction, regular maintenance, etc.). The gas boilers operate in a cascade configuration and feature weather-compensated control based on the outdoor temperature. The heating coils of the new air handling units (AHUs) are designed for a 60/40 °C temperature regime, with heating water supplied from the thermal substations. Some of the air handling units are equipped with adiabatic coolers, while the air handling units used for pool areas are equipped with integrated heat pumps for heat recovery. During the summer mode, the DT1 heat pump (1x 1,028 kW) provides cooling capacity (7/12 °C) for the cooling substation of the Old Building (Stara zgrada), using diverter valves on the water side. In this case, the condenser side of the unit heats the thermal water as it passes through the heat exchanger.

Challenges and experiences in project implementation

The reconstruction of the thermal energy system of the hospital complex required the simultaneous resolution of technical and organizational challenges. The works took place at several locations, within the framework of parallel projects and with tight deadlines associated with funding from European funds. At the same time, the hospital had to continue operating throughout, with an uninterrupted supply of heat and electricity. This required careful planning of reconnections, temporary operating modes, and coordination of all involved professions and contractors.

Integrating new equipment into the existing infrastructure posed a particular challenge, especially due to the limited space in the existing boiler room. The coordination of subsequent works by another contractor and the connection of the cooling system of the Old Building with the existing energy plant contributed further complexity. Therefore, during the execution and commissioning, the system configuration was modified several times in order to establish temporary operating modes.

One of the key challenges was identified during the commissioning of the system. When the consumers were operating simultaneously, the measured dynamic water level in the catchment was approximately 50 cm lower than expected based on previous hydrogeological analyses. Lowering the water level is particularly important due to the gravity-fed supply of the Aqua Vivae water park, whose suction strainer must remain submerged. During the operation of the system, a situation was also recorded in which Aqua Vivae was left without a water supply. At the same time, it was found that the heat pump system can meet the needs of the hospital complex even with a reduced flow of thermal water. This was facilitated by the oversizing of the evaporator intermediate circuit heat exchanger, which was foreseen in the design due to the uncertainty of the available pumping capacity. This design decision proved to be justified, as it enabled the transfer of the required heat even under less favourable conditions on the primary side.

Silting was also noticed in the catchment area, which poses a risk to the flow rate of the installation, the efficiency of heat exchange and the reliability of the pumping equipment. Since the source serves both energy and other users at the same time, further operation requires coordinated pumping management. The reconstruction of the pumping station, the possibility of frequency control of the pumps and connection to the central monitoring and control system create the prerequisites for more precise flow control. However, new hydrodynamic measurements and an assessment of the condition of the catchment are necessary to determine a sustainable pumping regime.

The reliability of the system depends not only on the choice of equipment but also on the quality of execution, preparation of installations and adjustment of regulation. The system includes more than 40 pumps, a large number of control and switching valves, and cascade control of heat pumps and boilers. Due to this configuration, commissioning is not completed by simply starting the device, but requires checking the hydraulic relationships, adjusting the operating points and coordinating the control of all subsystems. It is equally important that the personnel operating the plant understand the intended operating modes and procedures in the event of a change in load or the failure of an individual component.

During the operation of the cooling system in the Old Building (Stara zgrada), frequent starts and stops of the heat pump were observed at low cooling loads. It is expected that the connection of additional consumers, including the planned cooling system of the NBO building, will enable a more favourable utilization of the available cooling capacity.

The absence of separate metering of the electricity consumed by the operation of heat pumps and the heating or cooling energy delivered by the system to consumers has been identified as a shortcoming of the existing design. Without metered data, it is not possible to reliably determine the seasonal efficiency of the system, quantify the savings achieved, or identify deviations from the design values. The installation of appropriate meters should be one of the priorities for the further development of the system. Based on the measured operating data, it is possible to optimize the control algorithms, the regulation of the supply water temperature according to the outside temperature, and the flows on the source and consumer sides. Particular attention should be paid to managing the thermal water flow and the water level in the catchment, while ensuring the conditions for the uninterrupted supply of other users. During the design and implementation, the importance of timely consideration and acoustic requirements was noted. Noise protection in such plants must not be reduced to a subsequent measure, but must be verified under real operating conditions. Similarly, when reconstructing existing systems, it is necessary to provide sufficient space for new equipment, maintenance work and future upgrades, and to ensure high-quality coordination of projects carried out at different stages.

Conclusion

The reconstruction of the boiler room and the associated energy systems of the Special Hospital for Medical Rehabilitation Krapinske Toplice has established an integrated system in which geothermal heat pumps represent the primary source of thermal energy for heating and domestic hot water preparation, with gas boilers serving as a backup source and support during peak loads. The central monitoring and control system enables integrated management of the plant, while the further connection of cooling consumers presents an opportunity for better utilization of the installed capacity.

Experience from construction and operation confirms that the success of such a project cannot be assessed solely on the basis of the nominal capacities and characteristics of the installed equipment. Equally important elements are the integration of new devices into the existing infrastructure, water quality, hydraulic balancing, regulation, maintenance, and the availability of sources under real pumping conditions. In this project, the oversizing of the evaporator intermediate circuit heat exchanger enabled operation at a reduced thermal water flow rate, while deviations of the measured water level from previously expected values indicated the need for subsequent analysis.

The key lesson learned from the project is that the energy system must be viewed and optimized as a functional whole: from the geothermal source and its associated hydraulics, through heat pumps and auxiliary systems, to distribution, regulation, and end users. Only by combining high-quality design and implementation with measurement, maintenance, and adaptation to actual operating conditions is it possible to reliably evaluate and improve the operation of such a complex system in the long term.